Difference between revisions of "Reports"
From RCampus Wiki
Line 29: | Line 29: | ||
#Open the matrix to view by Evaluatee | #Open the matrix to view by Evaluatee | ||
#At the top right, click on 'Assessment Report' | #At the top right, click on 'Assessment Report' | ||
− | # | + | #At the left, click on an assessment to view the data |
Revision as of 20:38, 28 October 2013
Generate a report based on a rubric or standard.
Contents
Aggregate Reports
By Rubric
- Select a rubric
- Select criteria and output format
- Save the report (optional)
By Standards
- Enter Standards
- Select criteria and output format
- Save the report (optional)
Summary Reports
iRubric
- Open iRubric to grade any student
- At the top right of the iRubric screen, click on 'summary data'
- Select a format to view the data
Matrix
- Open the matrix to view by Evaluatee
- At the top right, click on 'Assessment Report'
- At the left, click on an assessment to view the data